Parvatmala

  • IASbaba
  • February 8, 2022
  • 0
UPSC Articles

Parvatmala

Part of: Prelims and GS-III Infrastructure 

Context: Union Finance Minister while presenting Union Budget for 2022-23 announced National Ropeways Development Programme – “Parvatmala”.

Key takeaways 

  • It will be taken up on PPP mode.
  • Ropeways will be a preferred ecologically sustainable alternative in place of conventional roads in difficult hilly areas.
  • The idea is to improve connectivity and convenience for commuters, besides promoting tourism. 
  • This may also cover congested urban areas, where conventional mass transit system is not feasible. 
  • The Finance Minister announced that contracts for 8 ropeway projects for a length of 60 km would be awarded in 2022-23. 
  • States being covered: The scheme is being presently started in regions like Uttarakhand, Himachal Pradesh, Manipur, Jammu & Kashmir and the other North Eastern states.

Major Factors Driving Ropeway Infrastructure 

  • Economical mode of transportation: Given that ropeway projects are built in a straight line over a hilly terrain, it also results in lower land acquisition costs. Hence, despite having a higher cost of construction per km than roadways, ropeway projects’ construction cost may happen to be economical than roadways. 
  • Faster mode of transportation: Owing to the aerial mode of transportation, ropeways have an advantage over roadway projects where ropeways can be built in a straight line, over a hilly terrain.
  • Environmentally friendly: Low dust emissions. Material containers can be designed so as to rule out any soiling of the environment.
  • Last mile connectivity: Ropeway projects adopting 3S (a kind of cable car system) or equivalent technologies can transport 6000-8000 passengers per hour.

News Source: PIB

Search now.....

Sign Up To Receive Regular Updates