UPSC Articles
Parvatmala
Part of: Prelims and GS-III Infrastructure
Context: Union Finance Minister while presenting Union Budget for 2022-23 announced National Ropeways Development Programme – “Parvatmala”.
Key takeaways
- It will be taken up on PPP mode.
- Ropeways will be a preferred ecologically sustainable alternative in place of conventional roads in difficult hilly areas.
- The idea is to improve connectivity and convenience for commuters, besides promoting tourism.
- This may also cover congested urban areas, where conventional mass transit system is not feasible.
- The Finance Minister announced that contracts for 8 ropeway projects for a length of 60 km would be awarded in 2022-23.
- States being covered: The scheme is being presently started in regions like Uttarakhand, Himachal Pradesh, Manipur, Jammu & Kashmir and the other North Eastern states.
Major Factors Driving Ropeway Infrastructure
- Economical mode of transportation: Given that ropeway projects are built in a straight line over a hilly terrain, it also results in lower land acquisition costs. Hence, despite having a higher cost of construction per km than roadways, ropeway projects’ construction cost may happen to be economical than roadways.
- Faster mode of transportation: Owing to the aerial mode of transportation, ropeways have an advantage over roadway projects where ropeways can be built in a straight line, over a hilly terrain.
- Environmentally friendly: Low dust emissions. Material containers can be designed so as to rule out any soiling of the environment.
- Last mile connectivity: Ropeway projects adopting 3S (a kind of cable car system) or equivalent technologies can transport 6000-8000 passengers per hour.
News Source: PIB